1881-06-09 – Express – Louis Dauth Reed-Dauth Block Built To Second Floor ⧉
The walls of the Reed & Dauth block are up to the second floor. The front is built of Golden pressed brick. J. W. Boyd has the contract for the brick work, and Perry Harrington for the carpenter work. ⧉
Date: 1881-06-09
Location: Fort Collins, Colorado, USA
Permalink:
https://dauthfamily.github.io/article/1881-06-09-express-louis-dauth-reed-dauth-block-built-to-second-floor/
⧉
Source
Express [Fort Collins, Colorado, USA], 9 Jun. 1881,
Newspapers.com.
Ancestry,
https://www.newspapers.com/.
MLA Format
Dauth Family Archive. "1881-06-09 – Express – Louis Dauth Reed-Dauth Block Built To Second Floor." Dauth Family Archive, 6 Jun. 2022, https://dauthfamily.github.io/article/1881-06-09-express-louis-dauth-reed-dauth-block-built-to-second-floor/. Accessed 25 Nov. 2023.
⧉
APA Format
Dauth Family Archive. (2022, June 6) 1881-06-09 – Express – Louis Dauth Reed-Dauth Block Built To Second Floor. Retrieved November 25, 2023, from https://dauthfamily.github.io/article/1881-06-09-express-louis-dauth-reed-dauth-block-built-to-second-floor/.
⧉
Chicago Format
Dauth Family Archive. "1881-06-09 – Express – Louis Dauth Reed-Dauth Block Built To Second Floor." Dauth Family Archive. June 6, 2022. Accessed November 25, 2023. https://dauthfamily.github.io/article/1881-06-09-express-louis-dauth-reed-dauth-block-built-to-second-floor/.
⧉